Case study
- 7 × 22 mtruss bridges
- 14towers of 9.4 m
- 5.4-6.2 mbridge height
- 28water ballast tanks
The challenge
A crossing challenge for 7 teams in a meadow of Lovćen National Park: 14 contestants in harness on bridges 5.4-6.2 m above the ground, with 7 camera zones. All the kit came by truck from Romania, and the build had to be as short as possible.
What we did
Full integration: the design, the rigging plots, a 3D scan of the clearing, the build documentation and parts lists, the kit (scaffold for the catwalks and cameras, truss), transport, the build crew and site coordination, with PPE and a fall-arrest line.
The result
The 7 bridges stood ready on the shooting day, 4 May 2025. The kit was back in Romania by 9 May.
3D / AR
3D model
Rotate, zoom, explore. On a phone you can place it in AR at real size.