Montenegro 2025

7 truss bridges for a TV shoot

Montenegro20253DAR
View the 3D model ↓

Case study

  • 7 × 22 mtruss bridges
  • 14towers of 9.4 m
  • 5.4-6.2 mbridge height
  • 28water ballast tanks

The challenge

A crossing challenge for 7 teams in a meadow of Lovćen National Park: 14 contestants in harness on bridges 5.4-6.2 m above the ground, with 7 camera zones. All the kit came by truck from Romania, and the build had to be as short as possible.

What we did

Full integration: the design, the rigging plots, a 3D scan of the clearing, the build documentation and parts lists, the kit (scaffold for the catwalks and cameras, truss), transport, the build crew and site coordination, with PPE and a fall-arrest line.

The result

The 7 bridges stood ready on the shooting day, 4 May 2025. The kit was back in Romania by 9 May.

3D / AR

3D model

Rotate, zoom, explore. On a phone you can place it in AR at real size.

SBX Rigging Calc

The calculator is coming soon

15+ years of rigging, gathered in one tool: loads on hanging points, rig plans, bridles and cantilevers, on the web, iPhone and Android. We are launching it soon. Until then, for a calculation or a project, write to us.