Bucharest Christmas Market
The market stage, two editions
Case study
- 2editions, 2023 and 2025
- 32.4 mthe 2025 stage width
- 14 mthe 2025 roof span
- 7.2 tof scaffolding in the 2023 stage
The challenge
The Christmas Market's main stage in front of the Palace of Parliament, built anew for every edition: a roofed scaffold stage, put up in November on a paved square, that has to stand all winter.
What we did
The stage design for every edition: the 3D model, the stage options, the assembly drawings, the parts lists and the structural check, plus technical assistance during the build.
The result
Both stages stood for the whole market, in 2023 and in 2025.
The 2023 edition
- 12.4 × 9.7 mstage footprint
- 8.3 mhigh
- 886scaffold parts, 7.2 t
- 7.65 mprinted walls
What we did
Four stage options compared, then the 3D model of the chosen one, the truss roof, the printed walls, the assembly drawings, the parts and ballast lists, the structural check and a sun study.
The result
Built from 20 to 29 November 2023, before the market opened.
3D / AR
3D model
Rotate, zoom, explore. On a phone you can place it in AR at real size.
The 2025 edition
- 32.4 mwide
- 14.3 mhigh
- 14 mgable roof span
- 9 × 5 mcentre LED screen
What we did
The BIM model of the stage, digital pre-assembly and logistics, the drawing book with the assembly details, the load sheets, stage design consultancy and two days of technical assistance on site.
The result
Delivered for the winter 2025 edition.
3D / AR
3D model
Rotate, zoom, explore. On a phone you can place it in AR at real size.