Case study
- 11 × 11 mstage footprint
- 4.30 mlift tower
- 8½ t hoists
- 3 minto clear the pitch (10 allowed)
The challenge
A stage for a half-time show in a stadium's centre circle, with an artist lift. The pitch had to be clear 10 minutes after the performance.
What we did
The design (3D model, parts lists, lift, stair and adapter-plate details) and the rigging plots, the kit (the platforms on swivel castors, the stairs, the automated trapdoor lift), transport, the build crew, site coordination and project management.
The result
The stage was delivered and used on 25 May 2024. Of the 10 minutes allowed, we cleared it off the pitch in 3, with 5 crews.
3D / AR
3D model
Rotate, zoom, explore. On a phone you can place it in AR at real size.