GDA Bucharest 2024

Automated modular stage

Bucharest2024Client: At Last Agency3DAR
View the 3D model ↓

Case study

  • 11 × 11 mstage footprint
  • 4.30 mlift tower
  • 8½ t hoists
  • 3 minto clear the pitch (10 allowed)

The challenge

A stage for a half-time show in a stadium's centre circle, with an artist lift. The pitch had to be clear 10 minutes after the performance.

What we did

The design (3D model, parts lists, lift, stair and adapter-plate details) and the rigging plots, the kit (the platforms on swivel castors, the stairs, the automated trapdoor lift), transport, the build crew, site coordination and project management.

The result

The stage was delivered and used on 25 May 2024. Of the 10 minutes allowed, we cleared it off the pitch in 3, with 5 crews.

3D / AR

3D model

Rotate, zoom, explore. On a phone you can place it in AR at real size.

SBX Rigging Calc

The calculator is coming soon

15+ years of rigging, gathered in one tool: loads on hanging points, rig plans, bridles and cantilevers, on the web, iPhone and Android. We are launching it soon. Until then, for a calculation or a project, write to us.