Rockstadt Extreme Fest 2026
Double scaffold stage, 90 m wide
Case study
- 90 moverall width
- 17 mhigh
- 18 × 14 mand 20 × 14 m, the main stages
- 15 m/smax wind with the mesh on
The challenge
Two twin main stages built from scaffolding side by side, plus a third stage, on open ground exposed to the wind: 90 m wide, 23 m deep and 17 m high in all. The hardest step: placing The Prodigy's 3-tonne lighting rig on the stage.
What we did
BIM design of the stages, design proposals and the rigging plots for every band touring with its own rig.
The result
The stages stood for the whole festival, 27-31 July 2026; the mesh comes off the structure when the wind goes above 15 m/s.